{"id":204,"date":"2026-03-01T20:02:35","date_gmt":"2026-03-01T20:02:35","guid":{"rendered":"https:\/\/lazierengineering.com\/?page_id=204"},"modified":"2026-03-04T21:26:03","modified_gmt":"2026-03-04T21:26:03","slug":"case-study-1-title-here","status":"publish","type":"page","link":"https:\/\/lazierengineering.com\/?page_id=204","title":{"rendered":"HAMILTON CONVENTION CENTRE 4 STOREY FULL SMEP ENGINEERING DESIGN"},"content":{"rendered":"\n<h2>\n\t\t\tHAMILTON CONVENTION CENTRE 4 STOREY FULL SMEP ENGINEERING DESIGN\t<\/h2>\n<figure itemscope itemtype=\"https:\/\/schema.org\/ImageObject\">\n\t\t\t\t<img decoding=\"async\" src=\"https:\/\/lazierengineering.com\/wp-content\/plugins\/bb-plugin\/img\/pixel.png\" alt=\"\" onerror=\"this.style.display='none'\" loading=\"lazy\" \/>\n\t<\/figure>\n<h2>\n\t\t\tOverview\t<\/h2>\n\t<p>Structural, Mechanical and Electrical Engineering Design for the entire HCC renovation.<\/p>\n<p>TEAM consists of:<\/p>\n<p>Structural , Mechanical and Electrical engineers &#8211; <strong>Lazier Engineering Partners Inc.<\/strong><\/p>\n<p>Architect\/Prime Consultant- <strong>Bind Architecture inc.<\/strong><\/p>\n<p>Interior Design Architect-<strong> Yellowbird design studio.<\/strong><\/p>\n<p>General Contractor-<strong>BDN Construction.<\/strong><\/p>\n<p>&nbsp;<\/p>\n<h2>\n\t\t\tClient\t<\/h2>\n\t<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/lazierengineering.com\/wp-content\/uploads\/2026\/03\/Hamilton-Convention-Centre-Lobby-297x300.webp\" alt=\"\" width=\"297\" height=\"300\" \/><\/p>\n<p>Hamilton Convention Centre by Carmen&#8217;s<\/p>\n<h2>\n\t\t\tChallenge\t<\/h2>\n\t<p>Design Structural openings, analyze existing structure for intended demolition and renovations.<\/p>\n<p>MEP design for interior renovations, HVAC design, plumbing and Electrical Engineering for extensive lighting upgrades.<\/p>\n<p>Design of lighting systems to be integrated with new Building Automation for the main concourse halls and meeting rooms on 4 levels of the building.<\/p>\n<h2>\n\t\t\tSolution\t<\/h2>\n\t-Prepare demolition drawing including all the lighting and power systems to be removed\/removed and<br \/>\nreplaced (site visits included).<br \/>\n-Review of lighting selection and photometric calculation, calculation for all areas (full list below)<br \/>\n-Provide circuiting for the new lighting layouts (Hall, Ballroom, Porter room, misc rooms listed)<br \/>\n-Provide power system layout as needed, including all equipment in new bar\/flex\/concession areas.<br \/>\n-Lighting control schematic for the Wentworth Hall and Chedoke Ballroom to suit new Building Automation system\n<p>-Structural engineering for bulkhead removal, larger exterior windows and analysis of existing SFRS structural system.<\/p>\n<p>-HVAC and Plumbing Engineering to suit change of occupancy and heat loss throughout.<\/p>\n<p>&nbsp;<\/p>\n<strong>Affected Areas:<\/strong> Lobby, 2 washrooms (Ground FL), Wentworth Hall, Staircase, 4 washrooms (2nd FL), Meeting<br \/>\nRMs 200, 201, 202, 203, 205, 206, Wellness room, Albion rooms (3 total), Flex space, wine bar, 4 washrooms,<br \/>\nMeeting room 314, Webster rooms (3 total), Webster lounge, Chedoke Hall.\n<h2>\n\t\t\tResults\t<\/h2>\n\t<p>Currently Under Construction, expected completion date 2026\/2027<\/p>\n\n","protected":false},"excerpt":{"rendered":"<p>HAMILTON CONVENTION CENTRE 4 STOREY FULL SMEP ENGINEERING DESIGN Overview Structural, Mechanical and Electrical Engineering Design for the entire HCC renovation. TEAM consists of: Structural , Mechanical and Electrical engineers &#8211; Lazier Engineering Partners Inc. Architect\/Prime Consultant- Bind Architecture inc. Interior Design Architect- Yellowbird design studio. General Contractor-BDN Construction. &nbsp; Client Hamilton Convention Centre by&hellip;<\/p>\n","protected":false},"author":1,"featured_media":183,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-204","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/lazierengineering.com\/index.php?rest_route=\/wp\/v2\/pages\/204","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lazierengineering.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/lazierengineering.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/lazierengineering.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/lazierengineering.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=204"}],"version-history":[{"count":0,"href":"https:\/\/lazierengineering.com\/index.php?rest_route=\/wp\/v2\/pages\/204\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lazierengineering.com\/index.php?rest_route=\/wp\/v2\/media\/183"}],"wp:attachment":[{"href":"https:\/\/lazierengineering.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=204"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}