{"id":205,"date":"2026-03-01T20:02:58","date_gmt":"2026-03-01T20:02:58","guid":{"rendered":"https:\/\/lazierengineering.com\/?page_id=205"},"modified":"2026-03-10T15:30:39","modified_gmt":"2026-03-10T15:30:39","slug":"case-study-2-title-here","status":"publish","type":"page","link":"https:\/\/lazierengineering.com\/?page_id=205","title":{"rendered":"Recreation Facilities &#8211; Empire Sportsplex, CLB Wellness Room, Albatross Indoor Golf Centre."},"content":{"rendered":"\n<h2>\n\t\t\tALBATROSS INDOOR GOLF MEP ENGINEERING \t<\/h2>\n<figure itemscope itemtype=\"https:\/\/schema.org\/ImageObject\">\n\t\t\t\t<img decoding=\"async\" src=\"https:\/\/lazierengineering.com\/wp-content\/uploads\/2026\/03\/Screenshot-2026-03-04-154447-scaled.png\" alt=\"Screenshot 2026-03-04 154447\" height=\"556\" width=\"2560\" title=\"Screenshot 2026-03-04 154447\" onerror=\"this.style.display='none'\" loading=\"lazy\" \/>\n\t<\/figure>\n<h2>\n\t\t\tOverview\t<\/h2>\n\t<p>Providing MEP engineering design with our architectural team at BIND architecture , designing the largest indoor golf facility in the city<\/p>\n<p>noteable recreation projects include<\/p>\n<p><strong>Empire Sportsplex<\/strong>&#8211; City of Welland ON.<\/p>\n<p>Full SMEP Engineering Services and Architectural support for a new Sports Facility Indoor\/outdoor in Welland Ontario. (included structural steel tower and use of shipping\u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0containers for building design.)<\/p>\n<p><strong>Community Living Burlington Wellness Room<\/strong>&#8211; Burlington ON.<\/p>\n<p>Full SMEP engineering and Architectural Support for CLB&#8217;s new Wellness room in burlington.<\/p>\n<p><strong>Albatross Indoor Golf Centre<\/strong>&#8211; Stoney Creek ON.<\/p>\n<p>Full SMEP engineering and Architectural Support for Albatross second location.<\/p>\n<p>&nbsp;<\/p>\n<h2>\n\t\t\tClient\t<\/h2>\n\t<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/lazierengineering.com\/wp-content\/uploads\/2026\/03\/community-living-burlington-300x75.png\" alt=\"\" width=\"300\" height=\"75\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/lazierengineering.com\/wp-content\/uploads\/2026\/03\/empire-communities.png\" alt=\"\" width=\"207\" height=\"103\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/lazierengineering.com\/wp-content\/uploads\/2026\/03\/albatross-logo-300x139.png\" alt=\"\" width=\"300\" height=\"139\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/lazierengineering.com\/wp-content\/uploads\/2026\/03\/city-of-welland-300x124.png\" alt=\"\" width=\"300\" height=\"124\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<h2>\n\t\t\tChallenge\t<\/h2>\n\t<p>Design of structural, mechanical and electrical systems to suit budget and solve problems for tight deadlines (mostly 2 weeks for design and permit)<\/p>\n<h2>\n\t\t\tSolution\t<\/h2>\n\t<p>To ensure seamless collaboration we use Bind Architects to complete projects and apply for a faster permit turnaround.<\/p>\n<p>on one indoor golf recreation project it was noted that during construction when the city flagged the use of existing fire alarm and life safety equipment it was noted to cost the client $20,000 to $40,000 in extras,<\/p>\n<p>a simple letter confirming code compliance from our electrical engineering team solved the problem and saved the client from spending extra money, keeping the project under budget.<\/p>\n<p>note: the units within the same plaza did not have engineers with code experience and had to spend more money on life safety upgrades not required by code.<\/p>\n<h2>\n\t\t\tResults\t<\/h2>\n\t<p>We experienced a very Happy client interaction and many referrals with an excellent testimonial .<\/p>\n<p>&#8221; I was on a very tight timeline, so I put a lot of faith in their ability to complete the job within that timeline.&#8221;<\/p>\n<p>&#8220;they accomplished this without a hitch&#8221;<\/p>\n<p>&#8220;the city was demanding additional fire equipment that was easily going to cost me and additional 5 figures&#8221;<\/p>\n<p>&#8220;the expertise and experience of the Lazier team resolved this quickly and saved me almost as much as they charge me&#8221;<\/p>\n<p>&#8220;well worth every penny and ill definitely use them again&#8221;<\/p>\n<p>&nbsp;<\/p>\n\n","protected":false},"excerpt":{"rendered":"<p>ALBATROSS INDOOR GOLF MEP ENGINEERING Overview Providing MEP engineering design with our architectural team at BIND architecture , designing the largest indoor golf facility in the city noteable recreation projects include Empire Sportsplex&#8211; City of Welland ON. Full SMEP Engineering Services and Architectural support for a new Sports Facility Indoor\/outdoor in Welland Ontario. (included structural&hellip;<\/p>\n","protected":false},"author":1,"featured_media":230,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-205","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/lazierengineering.com\/index.php?rest_route=\/wp\/v2\/pages\/205","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lazierengineering.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/lazierengineering.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/lazierengineering.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/lazierengineering.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=205"}],"version-history":[{"count":0,"href":"https:\/\/lazierengineering.com\/index.php?rest_route=\/wp\/v2\/pages\/205\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lazierengineering.com\/index.php?rest_route=\/wp\/v2\/media\/230"}],"wp:attachment":[{"href":"https:\/\/lazierengineering.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=205"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}